2017 Updated Projects List
Brackentrail to Wonderland connector
Brennan Channel to new campground - Mamquam south dike - trail extended to east of new MRaS campground
New Finch area development to Crumpit Woods pipeline right of way
Upgrade Sixth Ave to Bailey
Nature Trail upgrades, possible boardwalk - Investigated for where culverts may be required
Swan Trail upgrades - Swan south - added new trail crush to trail bed
Mamquam and Squamish Riverside trail
Tweeking Logger’s Creek Trail floods in several sections – could use a small boardwalk or lots of gravel
Judd beach trails (bridge abutments)
Mashiter Trail to Paco Road (Boulevard at bridge down to Paco)
Discovery Trail resurfacing and drainage
Ray Peter’s trail north end upgrades Railwoods trail, gravel
Dentville - extended from Leo crossing west to near Buckley street
Stairway to heaven - built new trail from Greenwood to Merrill peak
Laughing Turtle -completed outline and posted signs
Golf ball - connected to Corridor trail
Refurbished four trail kiosks and many thanks to DoS Ops for new bridge at Leo's crossing, new parking lot at Smoke Bluffs and new south section of Railwoods trail
Brushback crew worked 167 volunteer hours and 3.4 km of trail